Osaka Prefecture sold off 2.8 hectares (Osakashi Chuoku and the major foreland district with the prefecture public office buildings) in prefecture Arichi

| コメント(0) | トラックバック(0)
Osaka Prefecture sold off 2.8 hectares (Osakashi Chuoku and the major foreland district with the prefecture public office buildings) in prefecture Arichi, and brought the redeveloped city planning plan idea together. The siting faced Osakajo-Koen is made the best use of, the exclusive hotel, the concert hall, and the university, etc. are attracted, and it maintains it as a new culture and a sightseeing base.

It aims at the initiator of the Osaka regeneration that takes the place of the prefecture public office building relocation to failing Osaka World Trade Center building (WTC) by the large-scale development assumed to be the end by the core of Osaka.

It was voted down in prefecture Congress in March though governor Toru Hashishita proposed the legislative bill related to the public office building relocation as "The substantial change and the knock-on effect were brought to Osaka". Therefore, governor Hashishita is an instruction lingua as for the clearance of 2.8 hectares in the new public office building rebuilding land required for that becomes unnecessary while the policy of earthquake-proof reinforcing the main building of the prefecture public office building was decided and the discussion about the city planning plan.

As many as the maintenance object quarter region is 1.7 hectares in the main building south, 1.1 hectares on the west side according to the plan idea including the prefecture legation, and 2 breadths in the Koshien Stadium ground.
The south where it faced Osakajo-Koen discusses the campus in the concert hall, the convention hall, and the university and the special school. A west side near the Tanimachi muscle plans an exclusive hotel that established the restaurant and the museum as an annex and an office building and a high-level apartment and lot offered for sale, etc.

The business proposal is raised from the private business that becomes a development subject, and the south sells off the west side to the prefecture at as many as 16 fiscal years in fiscal year 2011 if it is early. 28.8 billion yen in total is expected, and disposal price is seismic retrofit expense of the main building and will allot to the public office building maintenance dollar of 30 years in the future, and aim at derating of the prefecture government finance.

The prefecture shortly formally proposes the plan idea to the prefecture Congress each party and faction in Diet. There is a voice to request real new public office building construction in prefecture Congress because the WTC relocation frustrated it, too and is a possibility of conflicting with governor Hashishita again.

The source
http://osaka.yomiuri.co.jp/news/20090612-OYO1T00248.htm?from=top

トラックバック(0)

トラックバックURL: http://www.japan-power.net/mt/mt-tb.cgi/911

コメントする

カテゴリ

ウェブページ

Powered by Movable Type 4.23-ja

このブログ記事について

このページは、jp_masterがJune 14, 2009 10:06 PMに書いたブログ記事です。

ひとつ前のブログ記事は「Hiroshimashi and a Chinese local finance bureau, etc. exchanged a basic accord to work on the saucer-making that called in the private investment jointly on the 14th」です。

次のブログ記事は「Mitsubishi Estate announced that 36 stores moved in a commercial zone in the Marunouchi park building that opened a business in Tokyo and Marunouchi on September 3」です。

最近のコンテンツはインデックスページで見られます。過去に書かれたものはアーカイブのページで見られます。